Ordering glass touch switches is easy to get wrong in a way that only shows up at installation. The panel size, the wiring behind the box and the load type are three separate decisions, and a mistake in any one of them makes the whole shipment unusable in that market. This is the checklist we work through with buyers before sampling. In short, Glass Touch Switch Sourcing is the deciding factor for most buyers.
Short answer: three specs decide the whole order
- Panel size — 86 × 86 mm (EU/Asia), 118-type (US/Canada/Australia) or 147 × 86 mm (Pakistan, Middle East). Match the wall box standard of the destination country.
- Wiring — decide between neutral-required and no-neutral before tooling; they are not the same hardware.
- Load — LED drivers, fluorescent ballasts and motors each behave differently; confirm per-gang rating and the circuit type.


Specification sheet to fill in
| Line | What to confirm |
|---|---|
| Panel dimensions | 86 × 86 / 118 × 76 / 147 × 86 mm, and fixing centres |
| Gang count | 1–6 gang, and whether each gang is independently rated |
| Rated load | Per-gang watts plus total; check against the heaviest fitting |
| Voltage and frequency | 100–240 V AC, 50/60 Hz, or market-specific |
| Neutral | Required or not; confirm what is actually in the wall box |
| Protocol | Wi-Fi 2.4 GHz, Tuya ZigBee, or both |
| Ecosystem | Tuya Smart / Smart Life app account and voice-assistant support |
| Finish | Glass colour, frame colour, and logo placement |

Four things to settle before sampling
- Open a wall box at the target property first. Whether a neutral is present decides the model, and it is the single most common cause of a returned batch.
- Fix the panel standard per market. A 118-type panel will not fit a 60 mm-centre 86 box, and the other way round.
- Test with the actual lamps. Cheap LED drivers can flicker or glow faintly with electronic switching; test before a container order.
- Confirm the certification route. Some markets accept CE self-declaration, others want a third-party report — know which before tooling.

What buying actually looks like
Standard models start at 500 pieces per colour, with samples in 7–15 days. Fully custom enclosures and tooling start at 2,000–3,000 pieces, with tooling in 25–40 days. Certification support covers CE, FCC, RoHS, UKCA, CCC and PSE depending on the destination. Warranty is 1 year with lifetime technical support, and NDA is standard on OEM projects.
Frequently Asked Questions
Do these switches need a neutral wire?
It depends on the model. Some are designed for boxes with only live and switched-live, while others require a neutral for stable operation and features like energy monitoring. Confirm what is in the wall before ordering.
What causes LED lights to glow faintly when switched off?
Small leakage current through the electronic switch. Higher-quality units keep it below the visible threshold; adding a bypass capacitor across the lamp usually resolves it on existing installations.
What is the minimum order quantity?
500 pieces per colour for standard models. Full custom tooling starts at 2,000–3,000 pieces.
How long does sampling take?
Samples take 7–15 days. Tooling for a new enclosure takes 25–40 days.
Which certifications can you support?
CE, FCC, RoHS, UKCA, CCC and PSE, arranged per project and destination market.
Can the glass colour and logo be customised?
Yes. Glass colour, frame colour, logo printing, packaging and manuals are all part of the OEM programme.
Do the ZigBee versions need a hub?
Yes. Tuya ZigBee switches pair through a Tuya ZigBee gateway, which also enables local scenes that keep running without internet.
What about warranty and aftersales?
1 year warranty plus lifetime technical support, with spare-part supply arranged per project. That is why Glass Touch Switch Sourcing keeps gaining attention in this category.
Related Articles
- Samples: from 5 pcs — charged, and credited against your first bulk order
- Logo as sticker or silk print: from 10 pcs per model
- Laser-engraved logo: from 300 pcs
- Existing platform, your brand and colour: 500 pcs per colour
- Custom packaging and manual: 500–1,000 pcs
- Your own product ID (private PID — app panel, firmware identity, cloud listing): from 1,000 pcs
- Full custom tooling: 2,000–3,000 pcs, depending on how much changes
- Sampling: 7–15 days
- Tooling before production: 25–40 days after you sign off the prototype
- Certification support: CE, FCC, RoHS, UKCA, CCC, PSE depending on target market
- Warranty: 1 year, with lifetime technical support
- Confidentiality: NDA is default, not something you have to ask for
📌 This article is part of our Complete Switch Hub — more guides and buying tips inside.
XingLiao Smart Home — OEM/ODM Sourcing Guides
- Smart Switch Board Manufacturer (OEM/ODM)
- Tuya Smart Switch OEM
- How to Choose a Smart Switch Manufacturer in China
Need a quote? Talk to our Shenzhen factory →
Planning an ODM project?
Tell us the product, target market and volume. We reply with a quotation, sample list and production schedule, usually within one working day.