XingLiao is a Shenzhen Smart home manufacturer supplying OEM, ODM and wholesale buyers in 30+ countries. We build switches, video doorbells, security cameras, curtain motors, sensors and Pet devices on 172 mass-production platforms — and we put your brand name, logo, packaging and app onboarding on every unit.
Chat on WhatsApp now Average reply time: under 2 hours, Monday to Saturday.
What we manufacture
Smart switches & sockets
Tuya WiFi, Tuya Zigbee, Matter and eWeLink platforms. 1–6 gang, 86 mm / 120 mm / 147×86 mm, EU / UK / US frames, no-neutral and single-live versions, glass or PC panels, energy monitoring on selected models.
Video doorbells & intercom
WiFi and no-WiFi sets, battery and Solar models, peephole cameras, 4G and RFID access units from tamper-proof housing to APP SDK white label.
Security cameras
Indoor, PTZ, solar, dual-lens and 4G models from 2 MP to 8 MP, Tuya and proprietary APP options, local and cloud storage.
Sensors & alarms
Tuya ZigBee PIR motion, door/window, temperature & humidity, rain, smoke and gas detectors — the accessory line that raises your average order value.
Curtain motors & smart panels
Tuya ZigBee curtain motors, roller and Roman rod drives, plus 4-inch to 8-inch whole-home control panels with knobs and relays.
OEM / ODM terms at a glance
| Item | Standard OEM | Full ODM / custom tooling |
|---|---|---|
| Minimum order | 5 pcs per colour | 2,000–3,000 pcs |
| Sampling lead time | 7–15 working days | |
| Tooling lead time | Not required | 25–40 working days |
| Branding | Silk print, laser, packaging, manual, APP logo & boot screen | |
| Certifications | CE, FCC, RoHS, UKCA, CCC, PSE available | |
| Warranty | 1 year + lifetime technical support | |
| NDA | Signed before drawings are shared | |
The customisation ladder — what each level of branding actually costs you in volume:
- Samples: from 5 pcs — charged, and credited against your first bulk order
- Logo as sticker or silk print: from 10 pcs per model
- Laser-engraved logo: from 300 pcs
- Existing platform, your brand and colour: 5 pcs per colour
- Custom packaging and manual: 500–1,000 pcs
- Your own product ID (private PID — app panel, firmware identity, cloud listing): from 1,000 pcs
- New tooling and ODM design: 2,000–3,000 pcs
We hold CE, FCC, RoHS, UKCA, CCC and PSE documentation and support buyer-side testing. Every project starts with a signed NDA, because your industrial design stays yours.
How a project runs
- Requirements — you tell us target market, protocol (Tuya WiFi / Tuya ZigBee / Matter), frame standard and volumes.
- Quotation within 48 hours — unit price tiers, tooling cost if any, packaging options.
- Samples in 7–15 days — standard boards ship first; enclosure changes add 3–5 days.
- Pilot run — 300–500 units for your own field testing and certification.
- Mass production — typical lead time 25–35 days after sample approval.
- After sales — firmware updates, replacement policy and 1-year warranty.
Factory
Shenzhen Xingliao Intelligent Technology Co., Ltd. operates in Bao’an, Shenzhen, with SMT, assembly, ageing-test and packing lines under one roof. 172 mass-production platforms across 16 categories mean most of your catalogue can be built on existing tooling — no NRE cost, shorter lead times. View factory & production lines →
Get prices on WhatsApp
Or email xingliaoshop@gmail.com · Contact page
Frequently Asked Questions
What is your MOQ for smart switches?
It depends on how deep the customisation goes. Samples start at 5 pcs and are charged, with the cost credited against your first bulk order. A sticker or silk-printed logo runs from 10 pcs per model, laser engraving from 300 pcs, an existing platform under your own brand and colour from 5 pcs per colour, custom packaging 500–1,000 pcs, your own product ID from 1,000 pcs, and full custom tooling from 2,000–3,000 pcs depending on how much of the design changes.
Can you put our brand on the product and the app?
Yes. Logo silk print or laser on the panel, custom retail packaging, multilingual manuals, and your brand inside the Tuya / Smart Life app onboarding and device list.
Which protocols do you support?
Tuya WiFi, Tuya ZigBee 3.0, Matter (selected models) and eWeLink. Tell us your target market and we will recommend the stack with the lowest certification cost.
How long does sampling take?
7–15 working days. Enclosure modifications add 3–5 days; new tooling takes 25–40 working days.
Do you provide CE, FCC and RoHS documents?
Yes — CE, FCC, RoHS, UKCA, CCC and PSE support is available, and we cooperate with buyer-side labs if you run your own testing.
Do you ship worldwide?
We ship EXW, FOB Shenzhen or DDP to most markets. Standard shipping is 8–18 working days, free above US$199 on retail orders.
Can we visit the factory?
Yes. Factory visits in Bao’an, Shenzhen are welcome, and we can run a video line tour first. About our company →
What warranty do you offer?
1 year warranty with lifetime technical support, including firmware updates and replacement parts supply.
Talk to an engineer instead of a sales bot — message us on WhatsApp and you get the person who runs your project.